Driftless Divided: Cardinal-Hickory Creek and Wisconsin Transmission Resistance

Loading...
Thumbnail Image

Date

Authors

Shapiro, Gabriel Noah

License

DOI

Type

Thesis

Journal Title

Journal ISSN

Volume Title

Publisher

Grantor

Abstract

Introduction to U.S. Transmission and Transmission Resistance: The U.S. is experiencing a renewable energy building boom. Transmission lines, along with wind and solar farms, are being proposed and built, across the country. In order to unlock renewable potential, most abundant in the nation’s center, we have been told, we need to build high voltage transmission lines (HVTLs) to get electricity to where it’s needed. These are not small projects and their price tags are growing. As public serving infrastructure, how they’re built matters. The way they’re designed will contribute to how they engage with, and serve society over time. Circulating discourses posit that “we need more HVTLs,” but often stop there, not asking, “what kind of HVTLs do we need?” Rural communities along the path of these projects often resist them, and as a result, developers and some supporters of renewable energy blame those communities, not only for slowing down individual projects but for slowing down the national transition to renewable energy. They are often depicted as either self-centered NIMBY’s (Not In My BackYard), overly pure “tradeoff denying” environmentalists, or “angry farmers” who just don’t like change, don’t know what they’re talking about, and aren’t making productive suggestions for alternatives. A narrative of “green civil war” depicts farmers and conservationists at war with renewables. This transition does need to happen quickly, in order for us to effectively address climate change. However, this common set of assumptions might actually be slowing the transition down more. Expecting the “barrier” of those kinds of opposition, HVTL developers often come into communities defensively, and at the last minute, delivering information selectively, and in one direction, an approach which ends up perpetuating conflict, lawsuits, and delays.

Description

A thesis submitted in partial fulfillment of the requirements for the degree of Master of Science (Geography / Environment & Resources) at the University of Wisconsin-Madison, 2025.

Related Material and Data

Citation

Sponsorship

Grants from the Department of Geography, the Nelson Institute for Environmental Studies and the Wes and Ankie Foell Scholarship in Energy Analysis and Policy.