A Hemimysis Driven Novel Ecosystem at a Modified Boulder Breakwall

Loading...
Thumbnail Image

License

DOI

Type

thesis

Journal Title

Journal ISSN

Volume Title

Publisher

Grantor

University of Wisconsin-Milwaukee

Abstract

The US Army Corps of Engineers (USACE) is mandated to maintain and repair aging breakwall structures in all commercial ports on the Great Lakes. In May of 2014, the construction of Milwaukee Harbor USACE “green” breakwall (GBW) reconciliation created complex rocky aquatic habitat by depositing cobble-sized stone as a veneer over standard 6-10 ton boulders, thus creating “control” (boulder) and “treatment” (cobble) habitats. The breakwall is home to a prolific population of Hemimysis anomala, the introduced Ponto-Caspian mysid, which is significantly more abundant on cobble versus boulders (p

Description

Related Material and Data

Citation

Sponsorship

Endorsement

Review

Supplemented By

Referenced By