A study on project iterations and the effects seen on system constraint and project duration
| dc.contributor.advisor | Olson, Diane | en_US |
| dc.contributor.author | Henk, Michael B. | en_US |
| dc.date.accessioned | 2010-04-28T22:09:39Z | |
| dc.date.available | 2010-04-28T22:09:39Z | |
| dc.date.issued | 2007 | en_US |
| dc.description | Includes bibliographical references. | en_US |
| dc.identifier.uri | http://www.uwstout.edu/lib/thesis/2007/2007henkm.pdf | en_US |
| dc.identifier.uri | http://digital.library.wisc.edu/1793/42317 | |
| dc.subject.lcsh | New products--Design and construction--Evaluation | en_US |
| dc.subject.lcsh | Product management | en_US |
| dc.title | A study on project iterations and the effects seen on system constraint and project duration | en_US |
| thesis.degree.discipline | Technology Management Program | en_US |
| thesis.degree.level | M.S. | en_US |
Files
Original bundle
1 - 1 of 1