Evaluation of bridge approach settlement mitigation methods

dc.contributor.authorGhorbanpoor, Al
dc.contributor.authorKoutnik, Therese Ellen
dc.contributor.authorHelwany, Sam
dc.date.accessioned2011-08-02T17:37:34Z
dc.date.available2011-08-02T17:37:34Z
dc.date.issued2007-10
dc.description131 p.en
dc.description.abstractOver the past 20 years, extensive research has been conducted to study the causes and mitigation methods of bridge approach settlement or "the bump at the end of the bridge." Many Departments of Transportation are significantly impacted by bridge approach settlement, as it causes unsafe driving conditions, rider discomfort, poor public perception of the state infrastructure, structural failure of bridges, and long-term maintenance costs. The literature has indicated that poor performance of pavement, bridge abutment and type, consolidation of the backfill materials, consolidation of the foundation's soils, and poor drainage are contributors to bridge approach settlement. Many mitigation techniques have been used to control the settlement, but the methods selected depend on the specific site. Techniques to repair the bump include asphalt patching or overlays, slab jacking, and replacement of approach slabs. Because of the considerable amount of money spent on repairing the differential settlement, DOTs and the Federal Highway Administration (FHWA) have funded numerous studies to determine the causes, mitigation methods, and maintenance techniques of bridge approach settlement. This study is part of one of these studies, "Evaluation of Bridge Approach Settlement Mitigation," sponsored by the Wisconsin Department of Transportation. The purpose of this paper is to document the performance and effectiveness of two mitigation techniques, geosynthetic reinforced fill and flowable fill, installed behind four Wisconsin bridges. This study includes an extensive literature review, discussion of the field investigation, and performance evaluation of field results of these four bridges.en
dc.identifier.otherOCLC: 182761838en
dc.identifier.otherTRID: 01082703en
dc.identifier.urihttp://digital.library.wisc.edu/1793/53948
dc.publisherWisconsin Highway Research Programen
dc.relation.ispartofseriesWHRP;07-14
dc.subjectWisconsinen
dc.subjectSettlement (Structures)en
dc.subjectRepairingen
dc.subjectReinforcing materialsen
dc.subjectPerformanceen
dc.subjectMaintenanceen
dc.subjectLiterature reviewsen
dc.subjectGeosyntheticsen
dc.subjectFlowable fillen
dc.subjectFillsen
dc.subjectField studiesen
dc.subjectEvaluationen
dc.subjectDifferential settlementen
dc.subjectBridgesen
dc.subjectBridge approachesen
dc.titleEvaluation of bridge approach settlement mitigation methodsen
dc.typeTechnical Reporten

Files

Original bundle

Now showing 1 - 2 of 2
Loading...
Thumbnail Image
Name:
Final%20Report%2000-13.pdf
Size:
15.43 MB
Format:
Adobe Portable Document Format
Description:
Final report
Loading...
Thumbnail Image
Name:
Appendices%2000-13.pdf
Size:
16.22 MB
Format:
Adobe Portable Document Format
Description:
Appendices

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
2.04 KB
Format:
Item-specific license agreed upon to submission
Description: