Rapid bridge construction technology, precast elements for substructures

Loading...
Thumbnail Image

Authors

Okumus, Pinar
Oliva, Michael
Unlu, Demirhan

Advisors

License

DOI

Type

Technical Report

Journal Title

Journal ISSN

Volume Title

Publisher

Wisconsin Highway Research Program

Grantor

Abstract

The goal of this research was to propose an alternate system of precast bridge substructures which can substitute for conventional cast in place systems in Wisconsin to achieve accelerated construction. Three types of abutment modules (hollow wall with cap, full height socketed, partial height socketed) are proposed for use in Wisconsin. Design calculation sheets, example designs, and standard type drawings have been provided for the modules. A special design method (in MathCad) and tutorial is provided for detailing reinforcing around the embedded pile in the socket of the abutments.

Description

232 p.

Related Material and Data

Citation

Sponsorship

Endorsement

Review

Supplemented By

Referenced By